筱田优在线播放_gogogo高清在线播放免费观看免费_白浆在线_300部国产真实乱_国语自产拍在线观看HD_全免费A级毛片免费看视频

EN
CN

15975603751/18620195016/13926003816
peter@mf-light.com / fu198368@163.com

 
NEWS
Stage lighting equipment maintenance
Release Date: [2018/1/10 16:02:03]    Total read [2230] Times
Lighting precautions
1, open half an hour before opening all the equipment, low temperature preheating, while testing all equipment and lines. Low temperature state is the light can be light;
2, boot up to fifteen minutes after all the equipment zero, so that equipment cooling, cooling time of not less than fifteen minutes;
3, after the heat, you can officially enter the music show stage;
4, the end of the show, the guests leave, the lighting division should close all the equipment, and let the equipment heat 15 to 20 minutes, and then the equipment for storage or mask, lighting division to leave.
Lighting equipment maintenance relative to the sound is more complex, but also more trivial, basically do the daily routine testing, weekly regular testing, monthly equipment maintenance and appropriate debugging;
Conventional detection ranges include:
1, whether the light bulb can be normal;
    2, all equipment wiring is normal;
3, all the equipment can be used normally, including the light control switch, color changer control, computer lights, etc. are normal;
4, DMX512 signal whether the normal control of lamps;
5, special effects equipment is normal use, and filled with the necessary materials, such as: smoke machine, fog machine, snow machine, bubble machine, etc .; stage lighting
Weekly periodic testing
Weekly periodic inspection In addition to the daily monitoring of all the items need to pay attention to the following points
1, in the week when the main test equipment connection, including the power connection, DMX512 connection, etc., to see if there is loosening, whether there are breakpoints and so on;
2, at the same time in the week when the test should be more comprehensive adjustment of the bit and DMX512 programming;
Monthly equipment maintenance and appropriate adjustments
Appropriate adjustment of the month In addition to the daily monitoring and weekly testing of all the work, it will be a very meticulous work, the need for coordination of multiple departments, such as actors, bands, weak, security, cleaning, etc., while the month When testing, complete the following tasks.
1, the lamp bit adjustment; because in use will appear part of the light position or guest area changes, resulting in changes in lamp position, so every month should be adjusted, of course, including DMX512 signal control of the computer lights ;
2, the detection of mechanical equipment, including the computer light motor, the color of the motor, special equipment, such as the nozzle, and so on;
3, check all lines. To detect whether there is a breakpoint, broken, whether there is leakage, because in use some of the human factors is the line there are a variety of unexpected situations, such as the leak of the wire was trampled, often plug the wire or breakpoint, Occasionally because of sprinkling with drinks on the line leakage and even short circuit, etc., so this test should be very careful. This test requires weak to complete;
4, clean the lamp inside and outside the dust and garbage. The light in use there will be some garbage, such as light bulb explosion in the lamp body of garbage, another long time in the audience area of ​​the computer lights, special effects machinery easily fall into some garbage, such as ribbons, glass ballast, drinks Of the residue and so on. So the lamp to the external garbage and dirt wipe clean, and the lights inside the garbage removed, this link needs cleaning with;
5, check all fire protection equipment. Lighting, sound is the most concentrated in the circuit of a type of work, strong power into the weak out of the relevant equipment and more related wire, so fire in the light work is the most important in the monthly routine check With the Ministry of Security, with all the fire protection facilities, fire fighting equipment for a comprehensive inspection, monitoring range, including the normal level of fire equipment, fire equipment selection is normal, whether the shelf life and so on;
In addition to the daily monitoring, weekly testing, monthly full inspection, the lighting division must be on the equipment and the environment is very understanding of all the circumstances, so please deal with in a timely manner, so as to get a good visual environment at the same time there are enough Security.
Copyright © Guangzhou Mingfeng Optoelectronics Technology Co., Ltd. All Rights Reserved.   粵ICP備2021037355號

Links: Xinhua      Fenghuang Wang

主站蜘蛛池模板: 丰满妇女做A级毛片 | 国产肉体XXXX裸体784大胆 | 泷泽萝拉全AV在线观看 | 亚洲国产欧美一区二区三区久久 | 欧美亚洲综合另类色妞网 | 欧美日韩人妻精品一区二区在线 | 黑人久久久 | 色玖玖综合 | 美女视频黄频大全不卡视频在线播放 | 精品麻豆cm视频在线看 | 欧美极品少妇BBXX中国 | 亚洲天天做日日做天天谢日日欢 | 精选国产AV精选一区二区三区 | 天堂中文在线8最新版地址 一区二区欧美视频 | 亚洲热视频在线观看 | 国产成年在线 | 国产精品爽爽久久久久久 | 亚洲午夜久久久久久久 | 久久视频一区二区 | 青青草原国产免费AV观看 | 最近MV中文字幕国语免费 | 亚洲情视频 | 强行扒开女同学腿看屁股眼 | 欧洲成在人线视频免费 | 少妇下面好紧好多水真爽播放 | 欧美丰满熟妇xxxx性大屁股 | 亚洲精品无码午夜福利理论片 | 天天操综 | 性虎精品无码AV导航 | 亚洲一区二区三区激情 | 国产精品视频一区在线观看 | 久久国产高潮流白浆免费观看 | 日韩亚洲AV无码一区二区不卡 | 欧美激情精品久久 | 国产日韩精品在线播放 | 国产成人免费观看久久久 | 亚洲欧美一区二区视频 | 日韩一区网站 | 成人性生交大片免费看 | 免费看黄网站免费网站 | 日本看黄网站 |